The third bridge at Koetong Creek was lost in the January 2026 Upper Murray bushfire. It was 47.4 m long and 3.5 m tall, consisting of 10 timber spans. The photos below show works to construct the High Country Rail Trail around the bridge.







The third bridge at Koetong Creek was lost in the January 2026 Upper Murray bushfire. It was 47.4 m long and 3.5 m tall, consisting of 10 timber spans. The photos below show works to construct the High Country Rail Trail around the bridge.






